ITAC Assessment: MI0024
ITAC logo
ITAC Assessment: MI0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Neurovascular products
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 10,000
ft2
Annual Production 400,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,745 3,002,304
kWh
Electricity Demand $42,140 5,436
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $171,231 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Primary Product Savings
01 2.2522: Isolate hot or cold equipment $156,000 $10,000 n/a - $156,000
02 3.1191: Change procedures / equipment / operating conditions $11,590 $7 n/a $11,590
494,260
kWh
-
03 2.7131: Add area lighting switches $2,108 $1,000 n/a $2,108
62,920
kWh
-
04 2.7131: Add area lighting switches $1,333 $700 n/a $1,333
39,780
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $200 $2 n/a $200
9,987
kWh
-
TOTAL RECOMMENDED $171,231 $11,709 $15,231
606,947
kWh
$156,000
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs