| Assessment Year | 2001 |
|---|---|
| Principal Product | Compact Discs |
| NAICS |
n/a
|
| SIC | 3652: Phonograph Records and Prerecorded Audio Tapes and Disks |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
75,000
ft2
|
| Annual Production | 37,440,000
pieces
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $471,171 | 8,980,219 |
kWh
|
$0.052 |
| Electricity Demand | $116,205 | 12,995 |
kW-mo/yr
|
$8.94 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $405,469 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|
| 01 | 3.1191: Change procedures / equipment / operating conditions | $279,552 | $120 | - | - | $279,552 | |
| 02 | 2.5194: Redesign process | $24,074 | $13,312 |
$24,074
454,222
kWh
|
- | - | |
| 03 | 4.454: Modify startup/shutdown times | $14,899 | $139 | - |
$14,899
-
kW-mo/yr
|
- | |
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $48,965 | $16 |
$48,965
923,870
kWh
|
- | - | |
| 05 | 2.7221: Lower temperature during the winter season and vice-versa | $21,743 | $16 |
$21,743
410,243
kWh
|
- | - | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $5,932 | $256 |
$4,763
89,856
kWh
|
$1,169
-
kW-mo/yr
|
- | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $10,304 | $256 |
$9,524
179,712
kWh
|
$780
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $405,469 | $14,115 |
$109,069
2,057,903
kWh
|
$16,848
-
kW-mo/yr
|
$279,552 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs