| Assessment Year | 2001 |
|---|---|
| Principal Product | Soft drink bottling |
| NAICS |
n/a
|
| SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
| Sales Range | $5 M to 10M |
| # of Employees | 100 |
| Plant Area |
124,392
ft2
|
| Annual Production | 184,800,000
pieces
|
| Production Hrs. Annual | 4,862
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $129,636 | 4,449,474 |
kWh
|
$0.029 |
| Electricity Demand | $39,157 | 10,743 |
kW-mo/yr
|
$3.64 |
| LPG | $2,520 | 2,635 |
MMBtu
|
$0.96 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $165,430 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,257 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.522: Modify storage space to avoid rental of a warehouse | $96,925 | $990 |
$1,885
36,967
kWh
|
- | - | $95,040 | |
| 02 | 4.513: Re-arrange equipment layout to reduce labor costs | $45,630 | - | - | - |
$630
-
MMBtu
|
$45,000 | |
| 03 | 4.454: Modify startup/shutdown times | $9,086 | $867 | - |
$9,086
-
kW-mo/yr
|
- | - | |
| 04 | 2.7232: Replace existing hvac unit with high efficiency model | $5,618 | $5,000 |
$5,618
76,908
kWh
|
- | - | - | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $661 | $5 |
$661
12,964
kWh
|
- | - | - | |
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $5,056 | $20 |
$5,056
99,136
kWh
|
- | - | - | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $2,454 | $80 |
$2,454
33,592
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $165,430 | $6,962 |
$15,674
259,567
kWh
|
$9,086
-
kW-mo/yr
|
$630
-
MMBtu
|
$140,040 | ||
| TOTAL IMPLEMENTED | $17,257 | $972 |
$8,171
145,692
kWh
|
$9,086
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs