| Assessment Year | 2001 |
|---|---|
| Principal Product | Hollow fiber for artificial kidney |
| NAICS |
n/a
|
| SIC | 3841: Surgical and Medical Instruments and Apparatus |
| Sales Range | $10 M to 50M |
| # of Employees | 75 |
| Plant Area |
40,000
ft2
|
| Annual Production | 42,650,919
thousand feet
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $495,715 | 8,247,642 |
kWh
|
$0.060 |
| Natural Gas | $88,871 | 15,237 |
MMBtu
|
$5.83 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $218,777 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Primary Product Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $9,063 | $414 |
$9,063
150,797
kWh
|
- | |
| 02 | 2.4321: Upgrade obsolete equipment | $22,409 | $6,500 |
$22,409
314,496
kWh
|
- | |
| 03 | 2.7233: Use properly designed and sized hvac equipment | $30,943 | $20 |
$30,943
514,865
kWh
|
- | |
| 04 | 4.652: Replace existing equipment with more suitable substitutes | $47,000 | $300 | - | $47,000 | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,034 | $3,531 |
$4,034
67,123
kWh
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,800 | $35 |
$1,800
29,950
kWh
|
- | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,119 | $690 |
$6,119
101,814
kWh
|
- | |
| 08 | 2.4323: Use optimum size and capacity equipment | $3,409 | $20 |
$3,409
170,446
kWh
|
- | |
| 09 | 4.111: Add equipment/ operators to reduce production bottleneck | $94,000 | $33,124 | - | $94,000 | |
| TOTAL RECOMMENDED | $218,777 | $44,634 |
$77,777
1,349,491
kWh
|
$141,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs