ITAC Assessment: MI0002
ITAC logo
ITAC Assessment: MI0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Hollow fiber for artificial kidney
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 40,000
ft2
Annual Production 42,650,919
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $495,715 8,247,642
kWh
Natural Gas $88,871 15,237
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $218,777 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Primary Product Savings
01 2.7111: Reduce illumination to minimum necessary levels $9,063 $414 $9,063
150,797
kWh
-
02 2.4321: Upgrade obsolete equipment $22,409 $6,500 $22,409
314,496
kWh
-
03 2.7233: Use properly designed and sized hvac equipment $30,943 $20 $30,943
514,865
kWh
-
04 4.652: Replace existing equipment with more suitable substitutes $47,000 $300 - $47,000
05 2.7447: Install vinyl strip / high speed / air curtain doors $4,034 $3,531 $4,034
67,123
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,800 $35 $1,800
29,950
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $6,119 $690 $6,119
101,814
kWh
-
08 2.4323: Use optimum size and capacity equipment $3,409 $20 $3,409
170,446
kWh
-
09 4.111: Add equipment/ operators to reduce production bottleneck $94,000 $33,124 - $94,000
TOTAL RECOMMENDED $218,777 $44,634 $77,777
1,349,491
kWh
$141,000
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs