ITAC Assessment: ME0290
ITAC logo
ITAC Assessment: ME0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Smoked seafood
NAICS
n/a
SIC 2091: Canned and Cured Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 40,000
ft2
Annual Production 2,400,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,416 1,337,632
kWh
Electricity Demand $35,476 4,195
kW-mo/yr
LPG $18,726 2,640
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $219,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,170

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Product Savings Increase in Production Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $59,165 $59,168 $69,444
938,746
kWh
$16,497
-
kW-mo/yr
$(-26,776.0)
-
MMBtu
- - - -
02 2.7496: Install partitions to reduce size of conditioned space $48,618 $10,860 $3,219
43,669
kWh
$399
-
kW-mo/yr
- - - - $45,000
03 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $2,732 $1,800 $2,732
36,342
kWh
- - - - - -
04 2.2437: Recover waste heat from equipment $1,690 $5,000 - - $1,690
-
MMBtu
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,685 $2,475 $1,372
19,637
kWh
$313
-
kW-mo/yr
- - - - -
06 3.5217: Reuse / recycle/ sell paper products $4,750 $9,000 - - - $4,750
-
lb
- - -
07 4.111: Add equipment/ operators to reduce production bottleneck $74,857 $270,000 - - $(-7,415.0)
-
MMBtu
- - $82,272 -
08 4.423: Move product using mechanical means $26,063 $13,600 $(-231.0)
(-3,517)
kWh
$(-106.0)
-
kW-mo/yr
- - $26,400 - -
TOTAL RECOMMENDED $219,560 $371,903 $76,536
1,034,877
kWh
$17,103
-
kW-mo/yr
$(-32,501.0)
-
MMBtu
$4,750
-
lb
$26,400 $82,272 $45,000
TOTAL IMPLEMENTED $32,170 $22,875 $3,873
52,462
kWh
$207
-
kW-mo/yr
$1,690
-
MMBtu
- $26,400 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs