Assessment Year 2000
Principal Product Fresh atlantic salmon
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 11,200
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 4,625
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,918 1,091,735
kWh
Electricity Demand $15,905 2,710
kW-mo/yr
LPG $15,164 1,709
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,821 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,894

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $66,856 $175,000 $89,395
983,880
kWh
- $15,159
-
MMBtu
$(-52,698.0)
-
MMBtu
- - $15,000
02 2.2136: Install / repair insulation on steam lines $3,387 $3,165 - - $3,387
-
MMBtu
- - - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,100 $6,600 $2,965
32,532
kWh
$1,374
-
kW-mo/yr
$(-1,239.0)
-
MMBtu
- - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,671 $5,350 $1,958
21,395
kWh
$845
-
kW-mo/yr
$868
-
MMBtu
- - - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $9,507 $2,400 $(-273.0)
(-2,931)
kWh
$(-532.0)
-
kW-mo/yr
- - - $10,312
-
lb
-
06 3.4156: Use flow control valves on equipment to optimize water use $300 $463 $98
1,172
kWh
- - - $202
-
Tgal
- -
TOTAL RECOMMENDED $86,821 $192,978 $94,143
1,036,048
kWh
$1,687
-
kW-mo/yr
$18,175
-
MMBtu
$(-52,698.0)
-
MMBtu
$202
-
Tgal
$10,312
-
lb
$15,000
TOTAL IMPLEMENTED $12,894 $5,565 $(-273.0)
(-2,931)
kWh
$(-532.0)
-
kW-mo/yr
$3,387
-
MMBtu
- - $10,312
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Water Disposal Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs