Assessment Year | 1999 |
---|---|
Principal Product | rotor blades |
NAICS |
n/a
|
SIC | 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units |
Sales Range | $10 M to 50M |
# of Employees | 290 |
Plant Area |
151,682
ft2
|
Annual Production | 982
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $467,127 | 6,191,090 |
kWh
|
$0.075 |
Electricity Demand | $93,992 | 24,700 |
kW-mo/yr
|
$3.81 |
Electricity Fees | $2,168 | - |
|
- |
LPG | $1,923 | 45 |
MMBtu
|
$42.73 |
Fuel Oil #2 | $59,515 | 17,382 |
MMBtu
|
$3.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,533 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,190 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,192 | $800 |
$17,192
215,123
kWh
|
- | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,457 | $45,260 |
$13,469
168,523
kWh
|
$2,988
-
kW-mo/yr
|
- | - | - | - | |
03 | 4.652: Replace existing equipment with more suitable substitutes | $10,208 | $4,185 |
$7,215
89,977
kWh
|
$2,993
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,320 | $4,374 |
$3,030
37,808
kWh
|
$1,204
-
kW-mo/yr
|
$(-914.0)
-
MMBtu
|
- | - | - | |
05 | 2.2691: Shut off cooling if cold outside air will cool process | $2,567 | $3,410 |
$2,567
32,239
kWh
|
- | - | - | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $2,243 | $2,041 |
$1,896
23,740
kWh
|
$347
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4322: Use or replace with energy efficient substitutes | $788 | $375 |
$788
9,965
kWh
|
- | - | - | - | - | |
08 | 4.821: Pay bills on time to avoid late fees | $507 | - | - | - | - | - | - | $507 | |
09 | 2.2511: Insulate bare equipment | $211 | $205 | - | - | - |
$211
-
MMBtu
|
- | - | |
10 | 3.7214: Reduce or eliminate waste | $1,040 | $150 | - | - | - | - |
$1,040
-
gal
|
- | |
TOTAL RECOMMENDED | $54,533 | $60,800 |
$46,157
577,375
kWh
|
$7,532
-
kW-mo/yr
|
$(-914.0)
-
MMBtu
|
$211
-
MMBtu
|
$1,040
-
gal
|
$507 | ||
TOTAL IMPLEMENTED | $31,190 | $7,176 |
$26,303
328,840
kWh
|
$3,340
-
kW-mo/yr
|
- | - |
$1,040
-
gal
|
$507 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | Other Liquid (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs