ITAC Assessment: ME0246
ITAC logo
ITAC Assessment: ME0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Woman's Footware
NAICS
n/a
SIC 3144: Women's Footwear, Except Athletic
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 200,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 2,750
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,514 982,708
kWh
Electricity Demand $41,899 3,561
kW-mo/yr
Electricity Fees $2,483 -
Fuel Oil #6 $41,166 13,271
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,224 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,986

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.2211: Use optimum temperature $8,238 - $246
3,517
kWh
$7,992
-
kW-mo/yr
- - -
02 2.2211: Use optimum temperature $7,462 - $1,608
22,860
kWh
$5,854
-
kW-mo/yr
- - -
03 2.8114: Change rate schedules or other changes in utility service $6,928 - - - - - $6,928
04 2.2511: Insulate bare equipment $5,134 $10,930 - - $5,134
-
MMBtu
- -
05 2.8121: Apply for tax-free status for energy purchases $1,568 - - - - - $1,568
06 4.652: Replace existing equipment with more suitable substitutes $18,894 $43,500 $144
2,052
kWh
- - $18,750
-
gal
-
TOTAL RECOMMENDED $48,224 $54,430 $1,998
28,429
kWh
$13,846
-
kW-mo/yr
$5,134
-
MMBtu
$18,750
-
gal
$8,496
TOTAL IMPLEMENTED $39,986 $54,430 $1,752
24,912
kWh
$5,854
-
kW-mo/yr
$5,134
-
MMBtu
$18,750
-
gal
$8,496
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs