| Assessment Year | 1998 |
|---|---|
| Principal Product | Woman's Footware |
| NAICS |
n/a
|
| SIC | 3144: Women's Footwear, Except Athletic |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
200,000
ft2
|
| Annual Production | 2,000,000
pieces
|
| Production Hrs. Annual | 2,750
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $72,514 | 982,708 |
kWh
|
$0.074 |
| Electricity Demand | $41,899 | 3,561 |
kW-mo/yr
|
$11.77 |
| Electricity Fees | $2,483 | - |
|
- |
| Fuel Oil #6 | $41,166 | 13,271 |
MMBtu
|
$3.10 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $48,224 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $39,986 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2211: Use optimum temperature | $8,238 | - |
$246
3,517
kWh
|
$7,992
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.2211: Use optimum temperature | $7,462 | - |
$1,608
22,860
kWh
|
$5,854
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.8114: Change rate schedules or other changes in utility service | $6,928 | - | - | - | - | - | $6,928 | |
| 04 | 2.2511: Insulate bare equipment | $5,134 | $10,930 | - | - |
$5,134
-
MMBtu
|
- | - | |
| 05 | 2.8121: Apply for tax-free status for energy purchases | $1,568 | - | - | - | - | - | $1,568 | |
| 06 | 4.652: Replace existing equipment with more suitable substitutes | $18,894 | $43,500 |
$144
2,052
kWh
|
- | - |
$18,750
-
gal
|
- | |
| TOTAL RECOMMENDED | $48,224 | $54,430 |
$1,998
28,429
kWh
|
$13,846
-
kW-mo/yr
|
$5,134
-
MMBtu
|
$18,750
-
gal
|
$8,496 | ||
| TOTAL IMPLEMENTED | $39,986 | $54,430 |
$1,752
24,912
kWh
|
$5,854
-
kW-mo/yr
|
$5,134
-
MMBtu
|
$18,750
-
gal
|
$8,496 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs