ITAC Assessment: ME0242
ITAC logo
ITAC Assessment: ME0242
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product storage and retrieval systems
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 48,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,025 535,756
kWh
Electricity Demand $17,154 2,030
kW-mo/yr
Electricity Fees $4,032 -
Natural Gas $23,289 3,182
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,553 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,161

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,934 $2,500 $4,019
69,754
kWh
$304
-
kW-mo/yr
$(-389.0)
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,602 $11,858 $2,637
37,808
kWh
$965
-
kW-mo/yr
- - -
03 2.2443: Re-use or recycle hot or cold process exhaust air $2,513 $8,600 - - $2,513
-
MMBtu
- -
04 2.8121: Apply for tax-free status for energy purchases $2,383 - - - - - $2,383
05 2.2515: Use optimum thickness insulation $1,126 $1,700 - - $1,126
-
MMBtu
- -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $591 $2,260 $245
3,517
kWh
$456
-
kW-mo/yr
$(-110.0)
-
MMBtu
- -
07 2.2515: Use optimum thickness insulation $392 $90 $392
5,862
kWh
- - - -
08 2.2515: Use optimum thickness insulation $90 $160 - - $90
-
MMBtu
- -
09 3.2123: Convert to high volume low pressure (hvlp) paint guns $4,922 $3,036 - - - $4,922
-
gal
-
TOTAL RECOMMENDED $19,553 $30,204 $7,293
116,941
kWh
$1,725
-
kW-mo/yr
$3,230
-
MMBtu
$4,922
-
gal
$2,383
TOTAL IMPLEMENTED $19,161 $30,114 $6,901
111,079
kWh
$1,725
-
kW-mo/yr
$3,230
-
MMBtu
$4,922
-
gal
$2,383
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs