Assessment Year | 1998 |
---|---|
Principal Product | Truck Bodies and Cranes |
NAICS |
n/a
|
SIC | 3713: Truck and Bus Bodies |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
16,160
ft2
|
Annual Production | 2,000
units
|
Production Hrs. Annual | 2,548
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $14,543 | 199,004 |
kWh
|
$0.073 |
Electricity Demand | $8,757 | 1,008 |
kW-mo/yr
|
$8.69 |
Electricity Fees | $588 | - |
|
- |
Natural Gas | $20,157 | 2,703 |
MMBtu
|
$7.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,927 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,254 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7495: Install replacement doors | $4,297 | $8,000 | - | - | - |
$4,297
-
MMBtu
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,607 | $17,669 |
$2,367
33,705
kWh
|
$1,240
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $2,854 | $10,432 | - | - | - |
$2,854
-
MMBtu
|
- | - | - | |
04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $1,583 | $3,576 | - | - | - |
$1,583
-
MMBtu
|
- | - | - | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $747 | $2,209 | - | - | - |
$747
-
MMBtu
|
- | - | - | |
06 | 2.8114: Change rate schedules or other changes in utility service | $306 | $1,090 |
$(-123.0)
(-1,758)
kWh
|
$(-46.0)
-
kW-mo/yr
|
$535 | - | - | - | $(-60.0) | |
07 | 2.8123: Pay utility bills on time | $176 | - | - | - | - |
$176
-
MMBtu
|
- | - | - | |
08 | 2.8123: Pay utility bills on time | $87 | - | - | - | $87 | - | - | - | - | |
09 | 3.6124: Burn waste oil for heat | $2,633 | $21,500 | - | - | - |
$2,633
-
MMBtu
|
- | - | - | |
10 | 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid | $1,637 | - |
$(-37.0)
(-586)
kWh
|
$(-126.0)
-
kW-mo/yr
|
- | - |
$2,400
-
gal
|
$(-600.0)
-
lb
|
- | |
TOTAL RECOMMENDED | $17,927 | $64,476 |
$2,207
31,361
kWh
|
$1,068
-
kW-mo/yr
|
$622 |
$12,290
-
MMBtu
|
$2,400
-
gal
|
$(-600.0)
-
lb
|
$(-60.0) | ||
TOTAL IMPLEMENTED | $6,254 | $19,878 |
$2,330
33,119
kWh
|
$1,114
-
kW-mo/yr
|
$87 |
$923
-
MMBtu
|
$2,400
-
gal
|
$(-600.0)
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs