Assessment Year | 1997 |
---|---|
Principal Product | Suspension Components |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
120,000
ft2
|
Annual Production | 62,606,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $528,535 | 6,226,553 |
kWh
|
$0.085 |
Electricity Demand | $92,171 | 13,264 |
kW-mo/yr
|
$6.95 |
Electricity Fees | $316 | - |
|
- |
LPG | $88,474 | 13,238 |
MMBtu
|
$6.68 |
Fuel Oil #2 | $53,857 | 9,853 |
MMBtu
|
$5.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,705 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,173 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $8,851 | - | - | - | - | - | - | - | $8,851 | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $6,178 | $1,300 |
$6,178
88,218
kWh
|
- | - | - | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,140 | $11,689 |
$4,087
43,376
kWh
|
$1,053
-
kW-mo/yr
|
- | - | - | - | - | - | |
04 | 2.2437: Recover waste heat from equipment | $4,451 | $1,500 | - | - | - |
$4,451
-
MMBtu
|
- | - | - | - | |
05 | 2.1113: Reduce combustion air flow to optimum | $2,505 | $400 | - | - |
$2,505
-
MMBtu
|
- | - | - | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $2,245 | $3,249 |
$911
12,896
kWh
|
$1,334
-
kW-mo/yr
|
- | - | - | - | - | - | |
07 | 2.2511: Insulate bare equipment | $700 | $160 |
$700
8,206
kWh
|
- | - | - | - | - | - | - | |
08 | 2.2136: Install / repair insulation on steam lines | $633 | $287 | - | - | - |
$633
-
MMBtu
|
- | - | - | - | |
09 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $17,950 | $17,900 | - | - | - | - | - |
$15,400
-
lb
|
$2,550 | - | |
10 | 3.4111: Use closed cycle process to minimize waste water production | $1,892 | $12,000 | - | - | - | - |
$1,892
-
Tgal
|
- | - | - | |
11 | 3.4115: Recover and reuse cooling water | $661 | $376 | - | - | - | - | - | - | - |
$661
-
Tgal
|
|
12 | 3.4116: Meter recycled water (to reduce sewer charges) | $499 | $600 | - | - | - | - |
$499
-
Tgal
|
- | - | - | |
TOTAL RECOMMENDED | $51,705 | $49,461 |
$11,876
152,696
kWh
|
$2,387
-
kW-mo/yr
|
$2,505
-
MMBtu
|
$5,084
-
MMBtu
|
$2,391
-
Tgal
|
$15,400
-
lb
|
$11,401 |
$661
-
Tgal
|
||
TOTAL IMPLEMENTED | $27,173 | $26,865 |
$10,265
131,594
kWh
|
$1,053
-
kW-mo/yr
|
- |
$4,451
-
MMBtu
|
$1,892
-
Tgal
|
- | $8,851 |
$661
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs