ITAC Assessment: ME0226
ITAC logo
ITAC Assessment: ME0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Suspension Components
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 120,000
ft2
Annual Production 62,606,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $528,535 6,226,553
kWh
Electricity Demand $92,171 13,264
kW-mo/yr
Electricity Fees $316 -
LPG $88,474 13,238
MMBtu
Fuel Oil #2 $53,857 9,853
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,705 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,173

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
01 2.8121: Apply for tax-free status for energy purchases $8,851 - - - - - - - $8,851 -
02 2.4221: Install compressor air intakes in coolest locations $6,178 $1,300 $6,178
88,218
kWh
- - - - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,140 $11,689 $4,087
43,376
kWh
$1,053
-
kW-mo/yr
- - - - - -
04 2.2437: Recover waste heat from equipment $4,451 $1,500 - - - $4,451
-
MMBtu
- - - -
05 2.1113: Reduce combustion air flow to optimum $2,505 $400 - - $2,505
-
MMBtu
- - - - -
06 2.4133: Use most efficient type of electric motors $2,245 $3,249 $911
12,896
kWh
$1,334
-
kW-mo/yr
- - - - - -
07 2.2511: Insulate bare equipment $700 $160 $700
8,206
kWh
- - - - - - -
08 2.2136: Install / repair insulation on steam lines $633 $287 - - - $633
-
MMBtu
- - - -
09 3.5248: Separate and recycle scrap metal to foundry or for sale $17,950 $17,900 - - - - - $15,400
-
lb
$2,550 -
10 3.4111: Use closed cycle process to minimize waste water production $1,892 $12,000 - - - - $1,892
-
Tgal
- - -
11 3.4115: Recover and reuse cooling water $661 $376 - - - - - - - $661
-
Tgal
12 3.4116: Meter recycled water (to reduce sewer charges) $499 $600 - - - - $499
-
Tgal
- - -
TOTAL RECOMMENDED $51,705 $49,461 $11,876
152,696
kWh
$2,387
-
kW-mo/yr
$2,505
-
MMBtu
$5,084
-
MMBtu
$2,391
-
Tgal
$15,400
-
lb
$11,401 $661
-
Tgal
TOTAL IMPLEMENTED $27,173 $26,865 $10,265
131,594
kWh
$1,053
-
kW-mo/yr
- $4,451
-
MMBtu
$1,892
-
Tgal
- $8,851 $661
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs