Assessment Year | 1997 |
---|---|
Principal Product | Regulators |
NAICS |
n/a
|
SIC | 3612: Power, Distribution, and Specialty Transformers |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
110,000
ft2
|
Annual Production | 3,250,000
lb
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $299,442 | 3,032,825 |
kWh
|
$0.099 |
Electricity Demand | $76,452 | 13,137 |
kW-mo/yr
|
$5.82 |
Electricity Fees | $2,733 | - |
|
- |
LPG | $25,084 | 3,332 |
MMBtu
|
$7.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,616 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Other Liquid (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $4,092 | $1,000 | n/a | - |
$4,092
-
MMBtu
|
- | - | - | - |
02 | 2.4221: Install compressor air intakes in coolest locations | $2,316 | $500 | n/a |
$2,316
33,118
kWh
|
- | - | - | - | - |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $759 | $400 | n/a | - |
$759
-
MMBtu
|
- | - | - | - |
04 | 2.8123: Pay utility bills on time | $852 | - | n/a | - | - | - | - | $852 | - |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $457 | $763 | n/a |
$457
6,448
kWh
|
- | - | - | - | - |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $370 | $100 | n/a |
$370
5,275
kWh
|
- | - | - | - | - |
07 | 2.8123: Pay utility bills on time | $204 | - | n/a | - | - | - | - | $204 | - |
08 | 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid | $25,833 | $24,000 | n/a | - |
$1,809
-
MMBtu
|
$24,024
-
gal
|
- | - | - |
09 | 3.4151: Minimize water usage | $5,685 | $1,400 | n/a | - | - | - | - | - |
$5,685
-
Tgal
|
10 | 3.3131: Use evaporation to concentrate material | $1,048 | $2,000 | n/a | - | - | - |
$1,048
-
lb
|
- | - |
11 | 4.212: Adopt in-house material generation | - | - | n/a | - | - | - | - | - | - |
TOTAL RECOMMENDED | $41,616 | $30,163 |
$3,143
44,841
kWh
|
$6,660
-
MMBtu
|
$24,024
-
gal
|
$1,048
-
lb
|
$1,056 |
$5,685
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Other Liquid (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs