ITAC Assessment: ME0220
ITAC logo
ITAC Assessment: ME0220
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Regulators
NAICS
n/a
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 110,000
ft2
Annual Production 3,250,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $299,442 3,032,825
kWh
Electricity Demand $76,452 13,137
kW-mo/yr
Electricity Fees $2,733 -
LPG $25,084 3,332
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,616 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings Water Consumption Savings
01 2.2437: Recover waste heat from equipment $4,092 $1,000 n/a - $4,092
-
MMBtu
- - - -
02 2.4221: Install compressor air intakes in coolest locations $2,316 $500 n/a $2,316
33,118
kWh
- - - - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $759 $400 n/a - $759
-
MMBtu
- - - -
04 2.8123: Pay utility bills on time $852 - n/a - - - - $852 -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $457 $763 n/a $457
6,448
kWh
- - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $370 $100 n/a $370
5,275
kWh
- - - - -
07 2.8123: Pay utility bills on time $204 - n/a - - - - $204 -
08 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $25,833 $24,000 n/a - $1,809
-
MMBtu
$24,024
-
gal
- - -
09 3.4151: Minimize water usage $5,685 $1,400 n/a - - - - - $5,685
-
Tgal
10 3.3131: Use evaporation to concentrate material $1,048 $2,000 n/a - - - $1,048
-
lb
- -
11 4.212: Adopt in-house material generation - - n/a - - - - - -
TOTAL RECOMMENDED $41,616 $30,163 $3,143
44,841
kWh
$6,660
-
MMBtu
$24,024
-
gal
$1,048
-
lb
$1,056 $5,685
-
Tgal
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs