ITAC Assessment: ME0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Garment Labels
NAICS
n/a
SIC 2241: Narrow Fabric and Other Smallware Mills: Cotton, Wool, Silk, and Manmade Fiber
Sales Range $5
M
to 10
M
# of Employees 97
Plant Area 24,000
ft2
Annual Production 338
pieces
Production Hrs. Annual 8,700
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,667 1,662,075
kWh
Electricity Demand $33,114 3,943
kW-mo/yr
Electricity Fees $1,029 -
Fuel Oil #2 $10,329 1,365
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,643 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,963

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 4.441: Install automatic packing equipment $54,750 $10,120 - - - - - - $54,750 - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,110 $20,420 $12,016
171,161
kWh
$1,196
-
kW-mo/yr
$(-4,102.0)
-
MMBtu
- - - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,379 $15,318 $8,659
123,681
kWh
$1,720
-
kW-mo/yr
- - - - - - -
04 2.2515: Use optimum thickness insulation $2,188 $1,640 - - - $2,188
-
MMBtu
- - - - -
05 2.2437: Recover waste heat from equipment $2,711 $3,950 $1,653
23,740
kWh
$1,058
-
kW-mo/yr
- - - - - - -
06 4.652: Replace existing equipment with more suitable substitutes $11,213 $1,400 - - - - - $37
-
lb
- - $11,176
07 3.5313: Increase amount of waste recovered for resale $3,300 - - - - - - $3,300
-
lb
- - -
08 3.5313: Increase amount of waste recovered for resale $580 $1,840 - - - - - $180
-
lb
- $400 -
09 3.4151: Minimize water usage $412 - $(-46.0)
(-586)
kWh
- - - $458
-
gal
- - - -
TOTAL RECOMMENDED $94,643 $54,688 $22,282
317,996
kWh
$3,974
-
kW-mo/yr
$(-4,102.0)
-
MMBtu
$2,188
-
MMBtu
$458
-
gal
$3,517
-
lb
$54,750 $400 $11,176
TOTAL IMPLEMENTED $65,963 $11,520 - - - - - $37
-
lb
$54,750 - $11,176
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs