Assessment Year | 1996 |
---|---|
Principal Product | milk |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $50 M to 100M |
# of Employees | 160 |
Plant Area |
40,500
ft2
|
Annual Production | 17,500,000
Tgal
|
Production Hrs. Annual | 6,300
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $400,854 | 4,548,359 |
kWh
|
$0.088 |
Electricity Demand | $84,997 | 9,854 |
kW-mo/yr
|
$8.63 |
Electricity Fees | $9,807 | - |
|
- |
Natural Gas | $607 | 77 |
MMBtu
|
$7.88 |
LPG | $10,397 | 1,137 |
MMBtu
|
$9.14 |
Fuel Oil #2 | $57,647 | 13,792 |
MMBtu
|
$4.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,490 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,954 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,551 | $9,015 |
$2,067
29,601
kWh
|
$484
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.8121: Apply for tax-free status for energy purchases | $963 | - | - | - | - | - | $963 | - | |
03 | 3.4157: Replace water cooling on processes with air cooling | $7,463 | $6,000 | - | - | - |
$6,307
-
Tgal
|
- |
$1,156
-
Tgal
|
|
04 | 3.4154: Eliminate leaks in water lines and valves | $3,628 | $600 | - | - |
$1,573
-
MMBtu
|
$1,745
-
Tgal
|
- |
$310
-
Tgal
|
|
05 | 3.4151: Minimize water usage | $2,684 | $400 | - | - | - |
$2,268
-
Tgal
|
- |
$416
-
Tgal
|
|
06 | 3.4151: Minimize water usage | $665 | - | - | - | - |
$570
-
Tgal
|
- |
$95
-
Tgal
|
|
07 | 3.4151: Minimize water usage | $536 | $2,000 |
$(-126.0)
(-1,758)
kWh
|
- |
$217
-
MMBtu
|
$380
-
Tgal
|
- |
$65
-
Tgal
|
|
TOTAL RECOMMENDED | $18,490 | $18,015 |
$1,941
27,843
kWh
|
$484
-
kW-mo/yr
|
$1,790
-
MMBtu
|
$11,270
-
Tgal
|
$963 |
$2,042
-
Tgal
|
||
TOTAL IMPLEMENTED | $17,954 | $16,015 |
$2,067
29,601
kWh
|
$484
-
kW-mo/yr
|
$1,573
-
MMBtu
|
$10,890
-
Tgal
|
$963 |
$1,977
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs