ITAC Assessment: ME0147
ITAC logo
ITAC Assessment: ME0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Circuit Boards
NAICS
n/a
SIC 3577: Computer Peripheral Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 311,000
ft2
Annual Production 350,000,000
pieces
Production Hrs. Annual 8,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,040,923 12,570,047
kWh
Fuel Oil #6 $69,872 22,025
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,059

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 2.8121: Apply for tax-free status for energy purchases $44,899 - - - - - $44,899 -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $26,440 $6,100 $32,790
395,955
kWh
$(-6,350.0)
-
MMBtu
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,133 $3,264 $4,133
49,824
kWh
- - - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,961 $4,160 $3,616
43,669
kWh
$(-655.0)
-
MMBtu
- - - -
05 2.2511: Insulate bare equipment $1,858 $2,365 - - - $1,858 - -
06 2.2443: Re-use or recycle hot or cold process exhaust air $1,311 $370 $1,311
13,189
kWh
- - - - -
07 2.7135: Install occupancy sensors $1,260 $300 $1,260
15,533
kWh
- - - - -
08 2.8123: Pay utility bills on time $1,077 - - - - - $1,077 -
09 3.4151: Minimize water usage $4,092 $60,000 - - $1,992
-
Tgal
- - $2,100
-
Tgal
10 3.4114: Replace city water with recycled water via cooling tower $6,122 $650 - - - - - $6,122
-
Tgal
11 3.4151: Minimize water usage $727 $440 - - $354
-
Tgal
- - $373
-
Tgal
TOTAL RECOMMENDED $94,880 $77,649 $43,110
518,170
kWh
$(-7,005.0)
-
MMBtu
$2,346
-
Tgal
$1,858 $45,976 $8,595
-
Tgal
TOTAL IMPLEMENTED $12,059 $4,354 $4,133
49,824
kWh
- $354
-
Tgal
- $1,077 $6,495
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #4 Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs