ITAC Assessment: ME0131
ITAC logo
ITAC Assessment: ME0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 76,000
ft2
Annual Production 75,000
thousand feet
Production Hrs. Annual 2,500
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,064,445 13,534,877
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $757,090 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,084 $7,000 $5,398
68,581
kWh
- $(-1,314.0)
-
MMBtu
02 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $690,090 $1,600,000 $690,090
6,278,429
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $61,130 $41,000 $61,130
776,671
kWh
- -
04 2.2437: Recover waste heat from equipment $1,786 $900 - $1,786
-
MMBtu
-
TOTAL RECOMMENDED $757,090 $1,648,900 $756,618
7,123,681
kWh
$1,786
-
MMBtu
$(-1,314.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs