Assessment Year | 1994 |
---|---|
Principal Product | Carbon fiber composites |
NAICS |
n/a
|
SIC | 3764: Guided Missile and Space Vehicle Propulsion Units and Propulsion Unit Parts |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
123,000
ft2
|
Annual Production | 150
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $518,936 | 6,024,326 |
kWh
|
$0.086 |
Natural Gas | $202,968 | 34,146 |
MMBtu
|
$5.94 |
Fuel Oil #2 | $28,112 | 5,378 |
MMBtu
|
$5.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $110,619 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $25,970 | $68,000 | - | - |
$25,970
-
MMBtu
|
|
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $364 | $811 |
$524
6,155
kWh
|
$(-160.0)
-
MMBtu
|
- | |
03 | 2.7226: Use computer programs to optimize hvac performance | $11,087 | $6,000 |
$11,087
130,129
kWh
|
- | - | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $288 | $75 | - |
$288
-
MMBtu
|
- | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,030 | $50 |
$1,030
12,016
kWh
|
- | - | |
06 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $58,800 | $120,000 |
$249,900
2,939,918
kWh
|
- |
$(-191,100.0)
-
MMBtu
|
|
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $13,080 | $15,000 |
$19,830
233,294
kWh
|
$(-6,750.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $110,619 | $209,936 |
$282,371
3,321,512
kWh
|
$(-6,622.0)
-
MMBtu
|
$(-165,130.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs