ITAC Assessment: ME0126
ITAC logo
ITAC Assessment: ME0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Carbon fiber composites
NAICS
n/a
SIC 3764: Guided Missile and Space Vehicle Propulsion Units and Propulsion Unit Parts
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 123,000
ft2
Annual Production 150
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $518,936 6,024,326
kWh
Natural Gas $202,968 34,146
MMBtu
Fuel Oil #2 $28,112 5,378
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,619 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.2426: Use waste heat from flue gases to heat space conditioning air $25,970 $68,000 - - $25,970
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $364 $811 $524
6,155
kWh
$(-160.0)
-
MMBtu
-
03 2.7226: Use computer programs to optimize hvac performance $11,087 $6,000 $11,087
130,129
kWh
- -
04 2.7221: Lower temperature during the winter season and vice-versa $288 $75 - $288
-
MMBtu
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,030 $50 $1,030
12,016
kWh
- -
06 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $58,800 $120,000 $249,900
2,939,918
kWh
- $(-191,100.0)
-
MMBtu
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,080 $15,000 $19,830
233,294
kWh
$(-6,750.0)
-
MMBtu
-
TOTAL RECOMMENDED $110,619 $209,936 $282,371
3,321,512
kWh
$(-6,622.0)
-
MMBtu
$(-165,130.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs