ITAC Assessment: MAS032
ITAC logo
ITAC Assessment: MAS032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Juice Packaging
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 50,000
ft2
Annual Production 1,500
Tgal
Production Hrs. Annual 6,240
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $787,961 9,269,935
kWh
Electricity Demand $208,842 20,178
kW-mo/yr
Electricity Fees $3,900 -
Natural Gas $199,320 25,723
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,452 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $256

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2611: Moderate cooling tower outlet temperature $8,920 $8,000 $8,920
104,940
kWh
-
02 2.4131: Size electric motors for peak operating efficiency $8,141 $8,000 $8,141
95,776
kWh
-
03 2.2414: Use waste heat from hot flue gases to preheat $7,897 $38,000 - $7,897
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,230 $20,000 $5,230
61,535
kWh
-
05 2.2511: Insulate bare equipment $1,008 $730 - $1,008
-
MMBtu
06 2.2511: Insulate bare equipment $256 $400 - $256
-
MMBtu
TOTAL RECOMMENDED $31,452 $75,130 $22,291
262,251
kWh
$9,161
-
MMBtu
TOTAL IMPLEMENTED $256 $400 - $256
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs