ITAC Assessment: AM0373
ITAC logo
ITAC Assessment: AM0373
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Critical service pipe connectors, closures and metal flanges
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 12,000
ft2
Annual Production 144,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,365 660,023
kWh
Electricity Demand $5,158 1,784
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,450 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $80,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 3.5248: Separate and recycle scrap metal to foundry or for sale $75,370 - - - $75,370
-
lb
-
02 2.3212: Optimize plant power factor $1,650 $2,100 - $1,650
-
kW-mo/yr
- -
03 2.7111: Reduce illumination to minimum necessary levels $1,300 $590 $375
14,947
kWh
$925
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,070 $16 $500
19,930
kWh
$570
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $930 $200 $930
37,222
kWh
- - -
06 2.4322: Use or replace with energy efficient substitutes $710 $2,350 $710
28,136
kWh
- - -
07 2.7111: Reduce illumination to minimum necessary levels $320 - $110
4,396
kWh
$210
-
kW-mo/yr
- -
08 4.821: Pay bills on time to avoid late fees $100 - - - - $100
TOTAL RECOMMENDED $81,450 $5,256 $2,625
104,631
kWh
$3,355
-
kW-mo/yr
$75,370
-
lb
$100
TOTAL IMPLEMENTED $80,150 $4,666 $2,250
89,684
kWh
$2,430
-
kW-mo/yr
$75,370
-
lb
$100
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs