| Assessment Year | 2012 |
|---|---|
| Principal Product | Precision Tooling |
| NAICS | 333511: Industrial Mold Manufacturing |
| SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
| Sales Range | $100 M to 500M |
| # of Employees | 16 |
| Plant Area |
44,000
ft2
|
| Annual Production | 3,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $276,573 | 2,036,764 |
kWh
|
$0.14 |
| Electricity Demand | $34,458 | 4,958 |
kW-mo/yr
|
$6.95 |
| Natural Gas | $16,285 | 1,451 |
MMBtu
|
$11.22 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,147 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,854 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2625: Chill water to the highest temperature possible | $13,149 | $500 |
$13,149
96,827
kWh
|
- | |
| 02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $12,915 | $22,500 |
$12,915
95,104
kWh
|
- | |
| 03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $8,202 | $22,100 |
$8,202
67,947
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $3,313 | $4,270 | - |
$3,313
-
MMBtu
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,392 | - |
$1,392
10,249
kWh
|
- | |
| 06 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $1,176 | $3,920 |
$1,176
9,768
kWh
|
- | |
| TOTAL RECOMMENDED | $40,147 | $53,290 |
$36,834
279,895
kWh
|
$3,313
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $17,854 | $4,770 |
$14,541
107,076
kWh
|
$3,313
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs