ITAC Assessment: MAS029
ITAC logo
ITAC Assessment: MAS029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Precision Tooling
NAICS 333511: Industrial Mold Manufacturing
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $100
M
to 500
M
# of Employees 16
Plant Area 44,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,573 2,036,764
kWh
Electricity Demand $34,458 4,958
kW-mo/yr
Natural Gas $16,285 1,451
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,147 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,854

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2625: Chill water to the highest temperature possible $13,149 $500 $13,149
96,827
kWh
-
02 2.2614: Use cooling tower or economizer to replace chiller cooling $12,915 $22,500 $12,915
95,104
kWh
-
03 2.2614: Use cooling tower or economizer to replace chiller cooling $8,202 $22,100 $8,202
67,947
kWh
-
04 2.2437: Recover waste heat from equipment $3,313 $4,270 - $3,313
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,392 - $1,392
10,249
kWh
-
06 2.2614: Use cooling tower or economizer to replace chiller cooling $1,176 $3,920 $1,176
9,768
kWh
-
TOTAL RECOMMENDED $40,147 $53,290 $36,834
279,895
kWh
$3,313
-
MMBtu
TOTAL IMPLEMENTED $17,854 $4,770 $14,541
107,076
kWh
$3,313
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs