ITAC Assessment: MAS021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Rubber Shaft Seals
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $50
M
to 100
M
# of Employees 409
Plant Area 290,000
ft2
Annual Production 365,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,361,923 15,704,834
kWh
Electricity Demand $333,063 33,311
kW-mo/yr
Fuel Oil #6 $685,242 44,116
MMBtu
Other Gas $281,188 16,131
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $173,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,550

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $99,334 $216,000 $(-29,800.0)
(-345,310)
kWh
$(-4,900.0)
-
kW-mo/yr
$134,034
-
MMBtu
-
02 2.6212: Turn off equipment during breaks, reduce operating time $36,978 $9,000 $36,978
428,480
kWh
- - -
03 2.4322: Use or replace with energy efficient substitutes $18,123 $77,100 $3,123
36,192
kWh
- - $15,000
04 2.4231: Reduce the pressure of compressed air to the minimum required $8,077 $8,000 $8,077
93,600
kWh
- - -
05 2.6242: Minimize operation of equipment maintained in standby condition $4,883 $3,120 $4,883
56,576
kWh
- - -
06 2.6242: Minimize operation of equipment maintained in standby condition $3,590 $3,120 $3,590
41,600
kWh
- - -
07 2.6212: Turn off equipment during breaks, reduce operating time $2,154 $2,000 $2,154
24,960
kWh
- - -
TOTAL RECOMMENDED $173,139 $318,340 $29,005
336,098
kWh
$(-4,900.0)
-
kW-mo/yr
$134,034
-
MMBtu
$15,000
TOTAL IMPLEMENTED $16,550 $14,240 $16,550
191,776
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs