ITAC Assessment: MAS017
ITAC logo
ITAC Assessment: MAS017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Film
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 30,000
ft2
Annual Production 20,000
thousand feet
Production Hrs. Annual 2,500
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,070 649,728
kWh
Electricity Demand $25,558 2,302
kW-mo/yr
Electricity Fees $3,900 -
Natural Gas $103,420 8,543
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,969 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,566

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $34,566 $10,000 - - $34,566 -
02 2.2442: Preheat combustion air with waste heat $4,892 $15,000 - - - $4,892
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $511 $200 $371
2,677
kWh
$140
-
kW-mo/yr
- -
TOTAL RECOMMENDED $39,969 $25,200 $371
2,677
kWh
$140
-
kW-mo/yr
$34,566 $4,892
-
MMBtu
TOTAL IMPLEMENTED $34,566 $10,000 - - $34,566 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs