Assessment Year | 2023 |
---|---|
Principal Product | Drinking water |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4941: Water Supply |
Sales Range | $1 M to 5M |
# of Employees | 9 |
Plant Area |
662,000
ft2
|
Annual Production | 520,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $213,082 | 1,497,800 |
kWh
|
$0.14 |
Electricity Demand | $38,064 | 3,652 |
kW-mo/yr
|
$10.42 |
Natural Gas | $4,127 | 291 |
MMBtu
|
$14.18 |
TOTAL YEARLY COSTS | $255,273 | |||
RECOMMENDED SAVINGS* | $126,909 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $61,906 | $581,126 |
$46,358
326,466
kWh
|
$2,418
-
kW-mo/yr
|
$13,130 | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $36,184 | $71,775 |
$32,880
231,547
kWh
|
$3,304
-
kW-mo/yr
|
- | |
03 | 2.7234: Use heat pump for space conditioning | $11,988 | $30,000 |
$10,821
76,202
kWh
|
$1,167
-
kW-mo/yr
|
- | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,662 | $500 | - |
$8,662
-
kW-mo/yr
|
- | |
05 | 2.7234: Use heat pump for space conditioning | $7,472 | $38,800 |
$6,794
47,633
kWh
|
$678
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $697 | $125 |
$509
3,586
kWh
|
$188
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $126,909 | $722,326 |
$97,362
685,434
kWh
|
$16,417
-
kW-mo/yr
|
$13,130 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs