ITAC Assessment: MA0863
ITAC logo
ITAC Assessment: MA0863
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Drinking water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 9
Plant Area 662,000
ft2
Annual Production 520,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,082 1,497,800
kWh
Electricity Demand $38,064 3,652
kW-mo/yr
Natural Gas $4,127 291
MMBtu
TOTAL YEARLY COSTS $255,273
RECOMMENDED SAVINGS* $126,909 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $61,906 $581,126 $46,358
326,466
kWh
$2,418
-
kW-mo/yr
$13,130
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $36,184 $71,775 $32,880
231,547
kWh
$3,304
-
kW-mo/yr
-
03 2.7234: Use heat pump for space conditioning $11,988 $30,000 $10,821
76,202
kWh
$1,167
-
kW-mo/yr
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,662 $500 - $8,662
-
kW-mo/yr
-
05 2.7234: Use heat pump for space conditioning $7,472 $38,800 $6,794
47,633
kWh
$678
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $697 $125 $509
3,586
kWh
$188
-
kW-mo/yr
-
TOTAL RECOMMENDED $126,909 $722,326 $97,362
685,434
kWh
$16,417
-
kW-mo/yr
$13,130
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs