ITAC Assessment: MA0860
ITAC logo
ITAC Assessment: MA0860
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Municipal Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 2
Plant Area 20,000
ft2
Annual Production 14,292
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,773 308,640
kWh
Electricity Demand $8,428 696
kW-mo/yr
Electricity Fees $360 -
Fuel Oil #2 $20,137 700
MMBtu
TOTAL YEARLY COSTS $78,698
RECOMMENDED SAVINGS* $10,534 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.7226: Use computer programs to optimize hvac performance $6,991 $1,650 - - $6,991
-
MMBtu
02 3.1191: Change procedures / equipment / operating conditions $1,955 $500 $1,773
11,010
kWh
$182
-
kW-mo/yr
-
03 2.7234: Use heat pump for space conditioning $1,588 $5,500 $1,322
8,212
kWh
$266
-
kW-mo/yr
-
TOTAL RECOMMENDED $10,534 $7,650 $3,095
19,222
kWh
$448
-
kW-mo/yr
$6,991
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs