ITAC Assessment: MA0858
ITAC logo
ITAC Assessment: MA0858
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Water treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $500
k
to 1
M
# of Employees 4
Plant Area 14,800
ft2
Annual Production 53,642
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,459 516,400
kWh
Electricity Demand $34,873 1,184
kW-mo/yr
Other Energy $9,694 299
MMBtu
Waste Disposal Costs
Water Usage $8,234 1,168
Tgal
TOTAL YEARLY COSTS $147,260
RECOMMENDED SAVINGS* $72,441 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.9114: Use solar heat to make electricty $29,333 $216,701 $21,176
115,715
kWh
- $8,157
02 2.4322: Use or replace with energy efficient substitutes $27,331 $166,000 $22,376
122,276
kWh
$4,955
-
kW-mo/yr
-
03 2.7234: Use heat pump for space conditioning $12,269 $11,300 $9,618
52,560
kWh
$2,651
-
kW-mo/yr
-
04 2.7234: Use heat pump for space conditioning $3,098 $5,000 $2,038
11,134
kWh
$1,060
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $204 $264 $116
633
kWh
$88
-
kW-mo/yr
-
06 3.1191: Change procedures / equipment / operating conditions $106 $375 $106
580
kWh
- -
07 3.1191: Change procedures / equipment / operating conditions $100 $375 $100
547
kWh
- -
TOTAL RECOMMENDED $72,441 $400,015 $55,530
303,445
kWh
$8,754
-
kW-mo/yr
$8,157
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs