| Assessment Year | 2023 |
|---|---|
| Principal Product | Elastomer Antivibration Mounts |
| NAICS | 326291: Rubber Product Manufacturing for Mechanical Use |
| SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
| Sales Range | $10 M to 50M |
| # of Employees | 239 |
| Plant Area |
71,250
ft2
|
| Annual Production | 17,000,000
lb
|
| Production Hrs. Annual | 7,448
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $347,197 | 2,832,541 |
kWh
|
$0.12 | |
| Electricity Demand | $193,490 | 7,025 |
kW-mo/yr
|
$27.54 | |
| Electricity Fees | $1,920 | - |
|
- | |
| Natural Gas | $73,089 | 5,792 |
MMBtu
|
$12.62 | |
| Waste Disposal Costs | |||||
| Water Usage | $5,188 | 483 |
Tgal
|
$10.74 | |
| Water Disposal | $10,595 | 483 |
Tgal
|
$21.92 | |
| TOTAL YEARLY COSTS | $631,479 | ||||
| RECOMMENDED SAVINGS* | $42,554 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $26,823 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,202 | $18,988 |
$8,979
73,004
kWh
|
$3,223
-
kW-mo/yr
|
- | |
| 02 | 2.7224: Reduce space conditioning during non-working hours | $10,946 | $949 |
$1,318
10,713
kWh
|
- |
$9,628
-
MMBtu
|
|
| 03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $7,672 | $30,500 |
$5,634
45,804
kWh
|
$2,038
-
kW-mo/yr
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,785 | $16,025 |
$(-146.0)
(-1,185)
kWh
|
$4,931
-
kW-mo/yr
|
- | |
| 05 | 2.4322: Use or replace with energy efficient substitutes | $3,613 | $59,377 |
$2,649
21,540
kWh
|
$964
-
kW-mo/yr
|
- | |
| 06 | 2.4322: Use or replace with energy efficient substitutes | $3,336 | $24,300 |
$2,455
19,960
kWh
|
$881
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $42,554 | $150,139 |
$20,889
169,836
kWh
|
$12,037
-
kW-mo/yr
|
$9,628
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $26,823 | $133,165 |
$19,717
160,308
kWh
|
$7,106
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs