ITAC Assessment: MA0853
ITAC logo
ITAC Assessment: MA0853
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Elastomer Antivibration Mounts
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 239
Plant Area 71,250
ft2
Annual Production 17,000,000
lb
Production Hrs. Annual 7,448
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $347,197 2,832,541
kWh
Electricity Demand $193,490 7,025
kW-mo/yr
Electricity Fees $1,920 -
Natural Gas $73,089 5,792
MMBtu
Waste Disposal Costs
Water Usage $5,188 483
Tgal
Water Disposal $10,595 483
Tgal
TOTAL YEARLY COSTS $631,479
RECOMMENDED SAVINGS* $42,554 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,823

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,202 $18,988 $8,979
73,004
kWh
$3,223
-
kW-mo/yr
-
02 2.7224: Reduce space conditioning during non-working hours $10,946 $949 $1,318
10,713
kWh
- $9,628
-
MMBtu
03 2.2614: Use cooling tower or economizer to replace chiller cooling $7,672 $30,500 $5,634
45,804
kWh
$2,038
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,785 $16,025 $(-146.0)
(-1,185)
kWh
$4,931
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $3,613 $59,377 $2,649
21,540
kWh
$964
-
kW-mo/yr
-
06 2.4322: Use or replace with energy efficient substitutes $3,336 $24,300 $2,455
19,960
kWh
$881
-
kW-mo/yr
-
TOTAL RECOMMENDED $42,554 $150,139 $20,889
169,836
kWh
$12,037
-
kW-mo/yr
$9,628
-
MMBtu
TOTAL IMPLEMENTED $26,823 $133,165 $19,717
160,308
kWh
$7,106
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs