ITAC Assessment: MA0851
ITAC logo
ITAC Assessment: MA0851
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $50
M
to 100
M
# of Employees 19
Plant Area 229,194
ft2
Annual Production 372
Tgal
Production Hrs. Annual 3,500
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $359,827 1,386,560
kWh
Electricity Demand $175,571 5,812
kW-mo/yr
Electricity Fees $47,827 -
Natural Gas $134,624 9,763
MMBtu
Waste Disposal Costs
Water Usage $96,820 6,787
Tgal
Water Disposal $35,985 1,867
Tgal
TOTAL YEARLY COSTS $850,654
RECOMMENDED SAVINGS* $233,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $166,002

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $135,448 $385,041 $100,089
384,956
kWh
$14,775
-
kW-mo/yr
- - - $20,584
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $43,839 $169,678 $63,950
193,433
kWh
- - $(-14,953.0)
-
MMBtu
$(-5,158.0) -
03 2.8121: Apply for tax-free status for energy purchases $28,576 $1,000 - - $28,576 - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,230 $3,215 $13,034
50,130
kWh
$5,196
-
kW-mo/yr
- - - -
05 2.1221: Replace obsolete burners with more efficient ones $5,872 $20,925 - - - $5,872
-
MMBtu
- -
06 2.4322: Use or replace with energy efficient substitutes $1,544 $5,977 $1,333
5,125
kWh
$211
-
kW-mo/yr
- - - -
07 2.2626: Avoid frost formation on evaporators $434 $216 $374
1,438
kWh
$60
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $233,943 $586,052 $178,780
635,082
kWh
$20,242
-
kW-mo/yr
$28,576 $(-9,081.0)
-
MMBtu
$(-5,158.0) $20,584
TOTAL IMPLEMENTED $166,002 $392,234 $101,796
391,519
kWh
$15,046
-
kW-mo/yr
$28,576 - - $20,584
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs