Assessment Year | 2023 |
---|---|
Principal Product | Beer |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $50 M to 100M |
# of Employees | 19 |
Plant Area |
229,194
ft2
|
Annual Production | 372
Tgal
|
Production Hrs. Annual | 3,500
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $359,827 | 1,386,560 |
kWh
|
$0.26 | |
Electricity Demand | $175,571 | 5,812 |
kW-mo/yr
|
$30.21 | |
Electricity Fees | $47,827 | - |
|
- | |
Natural Gas | $134,624 | 9,763 |
MMBtu
|
$13.79 | |
Waste Disposal Costs | |||||
Water Usage | $96,820 | 6,787 |
Tgal
|
$14.27 | |
Water Disposal | $35,985 | 1,867 |
Tgal
|
$19.27 | |
TOTAL YEARLY COSTS | $850,654 | ||||
RECOMMENDED SAVINGS* | $233,943 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $166,002 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $135,448 | $385,041 |
$100,089
384,956
kWh
|
$14,775
-
kW-mo/yr
|
- | - | - | $20,584 | |
02 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $43,839 | $169,678 |
$63,950
193,433
kWh
|
- | - |
$(-14,953.0)
-
MMBtu
|
$(-5,158.0) | - | |
03 | 2.8121: Apply for tax-free status for energy purchases | $28,576 | $1,000 | - | - | $28,576 | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,230 | $3,215 |
$13,034
50,130
kWh
|
$5,196
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.1221: Replace obsolete burners with more efficient ones | $5,872 | $20,925 | - | - | - |
$5,872
-
MMBtu
|
- | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $1,544 | $5,977 |
$1,333
5,125
kWh
|
$211
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.2626: Avoid frost formation on evaporators | $434 | $216 |
$374
1,438
kWh
|
$60
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $233,943 | $586,052 |
$178,780
635,082
kWh
|
$20,242
-
kW-mo/yr
|
$28,576 |
$(-9,081.0)
-
MMBtu
|
$(-5,158.0) | $20,584 | ||
TOTAL IMPLEMENTED | $166,002 | $392,234 |
$101,796
391,519
kWh
|
$15,046
-
kW-mo/yr
|
$28,576 | - | - | $20,584 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs