ITAC Assessment: MA0837
ITAC logo
ITAC Assessment: MA0837
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product biomedical products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area 42,960
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,714 1,533,200
kWh
Electricity Demand $22,308 3,050
kW-mo/yr
Electricity Fees $13,847 -
Natural Gas $18,850 1,318
MMBtu
Waste Disposal Costs
Water Usage $215 52
Tgal
Water Disposal $434 52
Tgal
TOTAL YEARLY COSTS $273,368
RECOMMENDED SAVINGS* $41,083 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,576

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $13,524 $1,250 - - $13,524 -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,317 $2,500 $9,042
63,678
kWh
- - $3,275
-
MMBtu
03 2.2614: Use cooling tower or economizer to replace chiller cooling $10,507 $46,265 $8,108
57,102
kWh
$2,399
-
kW-mo/yr
- -
04 2.6212: Turn off equipment during breaks, reduce operating time $1,956 $500 $1,956
13,775
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,463 $625 $1,368
9,636
kWh
$95
-
kW-mo/yr
- -
06 2.7224: Reduce space conditioning during non-working hours $1,316 $600 - - - $1,316
-
MMBtu
TOTAL RECOMMENDED $41,083 $51,740 $20,474
144,191
kWh
$2,494
-
kW-mo/yr
$13,524 $4,591
-
MMBtu
TOTAL IMPLEMENTED $30,576 $5,475 $12,366
87,089
kWh
$95
-
kW-mo/yr
$13,524 $4,591
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs