ITAC Assessment: MA0831
ITAC logo
ITAC Assessment: MA0831
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Electronic components and circuits
NAICS 334419: Other Electronic Component Manufacturing
SIC 3671: Electron Tubes
Sales Range $50
M
to 100
M
# of Employees 353
Plant Area 334,400
ft2
Annual Production 5,281
units
Production Hrs. Annual 8,592
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,263,570 9,093,600
kWh
Electricity Demand $111,007 19,272
kW-mo/yr
Electricity Fees $44,507 -
Natural Gas $183,372 16,551
MMBtu
Waste Disposal Costs
Water Usage $20,750 5,140
Tgal
Water Disposal $42,463 5,140
Tgal
TOTAL YEARLY COSTS $1,665,669
RECOMMENDED SAVINGS* $512,535 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $119,775

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $247,461 $2,531,558 $156,964
1,129,236
kWh
- - - - $90,497
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $60,697 $25,920 $38,373
276,068
kWh
- $22,324
-
MMBtu
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $42,489 $9,040 $20,165
145,076
kWh
- $22,324
-
MMBtu
- - -
04 3.3132: Use reverse osmosis to concentrate material $42,140 $270,000 $(-4,980.0)
(-35,829)
kWh
$(-288.0)
-
kW-mo/yr
- $15,562
-
Tgal
$31,846
-
Tgal
-
05 2.8121: Apply for tax-free status for energy purchases $41,831 $1,000 - - - - - $41,831
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $39,808 $21,525 $37,671
271,013
kWh
$2,137
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $34,657 $42,058 $32,762
235,696
kWh
$1,895
-
kW-mo/yr
- - - -
08 2.2614: Use cooling tower or economizer to replace chiller cooling $2,654 $15,630 $2,383
17,141
kWh
$271
-
kW-mo/yr
- - - -
09 2.2123: Insulate feedwater tank $798 $1,376 - - $798
-
MMBtu
- - -
TOTAL RECOMMENDED $512,535 $2,918,107 $283,338
2,038,401
kWh
$4,015
-
kW-mo/yr
$45,446
-
MMBtu
$15,562
-
Tgal
$31,846
-
Tgal
$132,328
TOTAL IMPLEMENTED $119,775 $53,474 $52,927
380,772
kWh
$1,895
-
kW-mo/yr
$23,122
-
MMBtu
- - $41,831
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs