| Assessment Year | 2022 |
|---|---|
| Principal Product | Electronic components and circuits |
| NAICS | 334419: Other Electronic Component Manufacturing |
| SIC | 3671: Electron Tubes |
| Sales Range | $50 M to 100M |
| # of Employees | 353 |
| Plant Area |
334,400
ft2
|
| Annual Production | 5,281
units
|
| Production Hrs. Annual | 8,592
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,263,570 | 9,093,600 |
kWh
|
$0.14 | |
| Electricity Demand | $111,007 | 19,272 |
kW-mo/yr
|
$5.76 | |
| Electricity Fees | $44,507 | - |
|
- | |
| Natural Gas | $183,372 | 16,551 |
MMBtu
|
$11.08 | |
| Waste Disposal Costs | |||||
| Water Usage | $20,750 | 5,140 |
Tgal
|
$4.04 | |
| Water Disposal | $42,463 | 5,140 |
Tgal
|
$8.26 | |
| TOTAL YEARLY COSTS | $1,665,669 | ||||
| RECOMMENDED SAVINGS* | $512,535 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $119,775 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $247,461 | $2,531,558 |
$156,964
1,129,236
kWh
|
- | - | - | - | $90,497 | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $60,697 | $25,920 |
$38,373
276,068
kWh
|
- |
$22,324
-
MMBtu
|
- | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $42,489 | $9,040 |
$20,165
145,076
kWh
|
- |
$22,324
-
MMBtu
|
- | - | - | |
| 04 | 3.3132: Use reverse osmosis to concentrate material | $42,140 | $270,000 |
$(-4,980.0)
(-35,829)
kWh
|
$(-288.0)
-
kW-mo/yr
|
- |
$15,562
-
Tgal
|
$31,846
-
Tgal
|
- | |
| 05 | 2.8121: Apply for tax-free status for energy purchases | $41,831 | $1,000 | - | - | - | - | - | $41,831 | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $39,808 | $21,525 |
$37,671
271,013
kWh
|
$2,137
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $34,657 | $42,058 |
$32,762
235,696
kWh
|
$1,895
-
kW-mo/yr
|
- | - | - | - | |
| 08 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,654 | $15,630 |
$2,383
17,141
kWh
|
$271
-
kW-mo/yr
|
- | - | - | - | |
| 09 | 2.2123: Insulate feedwater tank | $798 | $1,376 | - | - |
$798
-
MMBtu
|
- | - | - | |
| TOTAL RECOMMENDED | $512,535 | $2,918,107 |
$283,338
2,038,401
kWh
|
$4,015
-
kW-mo/yr
|
$45,446
-
MMBtu
|
$15,562
-
Tgal
|
$31,846
-
Tgal
|
$132,328 | ||
| TOTAL IMPLEMENTED | $119,775 | $53,474 |
$52,927
380,772
kWh
|
$1,895
-
kW-mo/yr
|
$23,122
-
MMBtu
|
- | - | $41,831 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs