ITAC Assessment: MA0828
ITAC logo
ITAC Assessment: MA0828
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Specialty paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $100
M
to 500
M
# of Employees 57
Plant Area 80,000
ft2
Annual Production 22,782
ton
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,705,591 20,936,000
kWh
Electricity Demand $268,202 33,525
kW-mo/yr
Electricity Fees $207 -
Fuel Oil #2 $52,871 3,774
MMBtu
Wood $740,756 349,213
MMBtu
Waste Disposal Costs
Water Usage $8,828 827
Tgal
TOTAL YEARLY COSTS $2,776,455
RECOMMENDED SAVINGS* $674,814 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $443,207 $3,043,367 - - $53,012
-
MMBtu
- - $390,195
02 2.2444: Use hot process fluids to preheat incoming process fluids $127,245 $144,842 - - $127,245
-
MMBtu
- - -
03 2.9114: Use solar heat to make electricty $64,198 $280,195 $32,813
405,097
kWh
$3,984
-
kW-mo/yr
- - $27,401 -
04 2.2437: Recover waste heat from equipment $29,256 $3,515 - - $35,756
-
MMBtu
$(-6,500.0) - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,386 $12,000 $8,578
105,900
kWh
$1,808
-
kW-mo/yr
- - - -
06 2.2511: Insulate bare equipment $522 $910 - - $522
-
MMBtu
- - -
TOTAL RECOMMENDED $674,814 $3,484,829 $41,391
510,997
kWh
$5,792
-
kW-mo/yr
$216,535
-
MMBtu
$(-6,500.0) $27,401 $390,195
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs