Assessment Year | 2020 |
---|---|
Principal Product | Water vessels |
NAICS | 332420: Metal Tank (Heavy Gauge) Manufacturing |
SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
Sales Range | $100 M to 500M |
# of Employees | 352 |
Plant Area |
262,950
ft2
|
Annual Production | 1,300,000
units
|
Production Hrs. Annual | 6,257
hrs
|
Location (State) | Rhode Island |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,276,774 | 11,406,271 |
kWh
|
$0.11 |
Electricity Demand | $266,766 | 26,103 |
kW-mo/yr
|
$10.22 |
Electricity Fees | $26,400 | - |
|
- |
Natural Gas | $652,084 | 78,254 |
MMBtu
|
$8.33 |
TOTAL YEARLY COSTS | $2,222,024 | |||
RECOMMENDED SAVINGS* | $957,601 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $757,206 | $3,776,148 |
$1,200,852
10,721,895
kWh
|
$127,316
-
kW-mo/yr
|
$(-367,247.0)
-
MMBtu
|
$(-203,715.0) | |
02 | 2.7313: Recycle air for heating, ventilation and air conditioning | $111,102 | $465,300 |
$(-52,170.0)
(-465,800)
kWh
|
$(-9,729.0)
-
kW-mo/yr
|
$173,001
-
MMBtu
|
- | |
03 | 2.3212: Optimize plant power factor | $76,578 | $123,800 | - |
$76,578
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,327 | $36,850 |
$6,958
62,126
kWh
|
$1,369
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,388 | $2,000 |
$4,388
39,181
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $957,601 | $4,404,098 |
$1,160,028
10,357,402
kWh
|
$195,534
-
kW-mo/yr
|
$(-194,246.0)
-
MMBtu
|
$(-203,715.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs