ITAC Assessment: MA0823
ITAC logo
ITAC Assessment: MA0823
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Water vessels
NAICS 332420: Metal Tank (Heavy Gauge) Manufacturing
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $100
M
to 500
M
# of Employees 352
Plant Area 262,950
ft2
Annual Production 1,300,000
units
Production Hrs. Annual 6,257
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,276,774 11,406,271
kWh
Electricity Demand $266,766 26,103
kW-mo/yr
Electricity Fees $26,400 -
Natural Gas $652,084 78,254
MMBtu
TOTAL YEARLY COSTS $2,222,024
RECOMMENDED SAVINGS* $957,601 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $757,206 $3,776,148 $1,200,852
10,721,895
kWh
$127,316
-
kW-mo/yr
$(-367,247.0)
-
MMBtu
$(-203,715.0)
02 2.7313: Recycle air for heating, ventilation and air conditioning $111,102 $465,300 $(-52,170.0)
(-465,800)
kWh
$(-9,729.0)
-
kW-mo/yr
$173,001
-
MMBtu
-
03 2.3212: Optimize plant power factor $76,578 $123,800 - $76,578
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,327 $36,850 $6,958
62,126
kWh
$1,369
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,388 $2,000 $4,388
39,181
kWh
- - -
TOTAL RECOMMENDED $957,601 $4,404,098 $1,160,028
10,357,402
kWh
$195,534
-
kW-mo/yr
$(-194,246.0)
-
MMBtu
$(-203,715.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs