ITAC Assessment: MA0821
ITAC logo
ITAC Assessment: MA0821
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Finished Textiles and Other Flocked Products
NAICS 313320: Fabric Coating Mills
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 180,000
ft2
Annual Production 12,000
thousand feet
Production Hrs. Annual 2,700
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,281 981,000
kWh
Electricity Demand $34,440 5,322
kW-mo/yr
Electricity Fees $2,676 -
Natural Gas $88,784 10,150
MMBtu
Waste Disposal Costs
Water Usage $2,136 412
Tgal
Water Disposal $2,349 412
Tgal
TOTAL YEARLY COSTS $247,666
RECOMMENDED SAVINGS* $59,402 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2212: Use minimum safe oven ventilation $48,924 $61,470 $9,930
82,749
kWh
- $38,994
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,991 $23,275 $8,991
74,928
kWh
- -
03 2.3212: Optimize plant power factor $997 $1,400 - $997
-
kW-mo/yr
-
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $490 $1,785 - - $490
-
MMBtu
TOTAL RECOMMENDED $59,402 $87,930 $18,921
157,677
kWh
$997
-
kW-mo/yr
$39,484
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs