ITAC Assessment: MA0816
ITAC logo
ITAC Assessment: MA0816
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Treated water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $5
M
to 10
M
# of Employees 4
Plant Area 13,050
ft2
Annual Production 400,000
Tgal
Production Hrs. Annual 2,340
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,358 1,224,800
kWh
Electricity Demand $12,626 2,192
kW-mo/yr
Electricity Fees $2,676 -
Natural Gas $7,973 819
MMBtu
TOTAL YEARLY COSTS $159,633
RECOMMENDED SAVINGS* $71,568 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $917

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $66,795 $292,241 $35,915
323,559
kWh
- $30,880
02 2.3134: Shift from daytime to nighttime operation $3,363 $3,000 $(-82.0)
(-3,959)
kWh
$3,445
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $917 $4,629 $721
6,494
kWh
$196
-
kW-mo/yr
-
04 3.1191: Change procedures / equipment / operating conditions $493 $100 $493
4,439
kWh
- -
TOTAL RECOMMENDED $71,568 $299,970 $37,047
330,533
kWh
$3,641
-
kW-mo/yr
$30,880
TOTAL IMPLEMENTED $917 $4,629 $721
6,494
kWh
$196
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs