ITAC Assessment: MA0814
ITAC logo
ITAC Assessment: MA0814
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Plastic Injection Molded Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 156
Plant Area 90,292
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 6,257
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $411,572 3,582,000
kWh
Electricity Demand $66,584 9,998
kW-mo/yr
Electricity Fees $233 -
LPG $138,019 10,291
MMBtu
Waste Disposal Costs
Water Usage $3,667 337
Tgal
Water Disposal $5,391 337
Tgal
TOTAL YEARLY COSTS $625,466
RECOMMENDED SAVINGS* $183,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,339

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.9114: Use solar heat to make electricty $89,868 $533,354 $89,868
781,457
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $40,091 $65,600 $3,785
32,909
kWh
- $36,306
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $33,887 $69,625 $29,189
253,816
kWh
$4,698
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,788 $12,100 $9,788
85,117
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,694 $12,100 $5,694
49,517
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,857 $4,096 $3,484
30,292
kWh
$373
-
kW-mo/yr
-
TOTAL RECOMMENDED $183,185 $696,875 $141,808
1,233,108
kWh
$5,071
-
kW-mo/yr
$36,306
-
MMBtu
TOTAL IMPLEMENTED $19,339 $28,296 $18,966
164,926
kWh
$373
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs