| Assessment Year | 2001 |
|---|---|
| Principal Product | Aluminum extrusions |
| NAICS |
n/a
|
| SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
250,000
ft2
|
| Annual Production | 12,000,000
lb
|
| Production Hrs. Annual | 5,520
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $353,231 | 4,701,320 |
kWh
|
$0.075 |
| Electricity Fees | $12,734 | - |
|
- |
| Natural Gas | $185,477 | 28,834 |
MMBtu
|
$6.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,074 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,521 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $6,884 | $1,584 | - | - |
$6,884
-
MMBtu
|
- | |
| 02 | 2.2511: Insulate bare equipment | $6,884 | $10,424 | - | - |
$6,884
-
MMBtu
|
- | |
| 03 | 2.7134: Use photocell controls | $3,669 | $325 |
$3,528
49,266
kWh
|
$141 | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,075 | $1,140 |
$4,880
68,145
kWh
|
$195 | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,388 | $1,830 |
$5,181
72,346
kWh
|
$207 | - | - | |
| 06 | 3.5313: Increase amount of waste recovered for resale | $6,174 | - | - | - | - |
$6,174
-
lb
|
|
| TOTAL RECOMMENDED | $34,074 | $15,303 |
$13,589
189,757
kWh
|
$543 |
$13,768
-
MMBtu
|
$6,174
-
lb
|
||
| TOTAL IMPLEMENTED | $23,521 | $4,554 |
$10,061
140,491
kWh
|
$402 |
$6,884
-
MMBtu
|
$6,174
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs