ITAC Assessment: MA0812
ITAC logo
ITAC Assessment: MA0812
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Surgical and Medical Instruments
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 474
Plant Area 690,000
ft2
Annual Production 505,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $587,425 4,450,755
kWh
Electricity Demand $45,419 8,764
kW-mo/yr
Electricity Fees $2,676 -
Natural Gas $209,539 16,125
MMBtu
Waste Disposal Costs
Water Usage $27,354 3,068
Tgal
Water Disposal $41,268 2,168
Tgal
TOTAL YEARLY COSTS $913,681
RECOMMENDED SAVINGS* $358,845 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,579

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $228,815 $892,794 $228,815
1,495,520
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $56,847 $3,250 $4,737
30,964
kWh
$52,110
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,615 $32,940 $35,615
232,780
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,190 $5,960 $17,190
112,353
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,774 $16,650 $11,774
76,952
kWh
-
06 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $8,604 $500 $274
1,791
kWh
$8,330
-
MMBtu
TOTAL RECOMMENDED $358,845 $952,094 $298,405
1,950,360
kWh
$60,440
-
MMBtu
TOTAL IMPLEMENTED $64,579 $55,550 $64,579
422,085
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs