ITAC Assessment: MA0810
ITAC logo
ITAC Assessment: MA0810
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Sewage water treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 22
Plant Area 38,352
ft2
Annual Production 2,738,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $282,897 2,493,360
kWh
Electricity Demand $28,863 9,124
kW-mo/yr
Electricity Fees $(-2,715.0) -
Natural Gas $37,260 4,604
MMBtu
Fuel Oil #2 $2,127 140
MMBtu
TOTAL YEARLY COSTS $348,432
RECOMMENDED SAVINGS* $19,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,594

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,872 $17,950 $5,167
45,728
kWh
$705
-
kW-mo/yr
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $4,788 $8,400 $4,310
38,146
kWh
$478
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,797 $625 $3,797
33,603
kWh
-
04 2.4322: Use or replace with energy efficient substitutes $3,310 $51,675 $3,247
28,736
kWh
$63
-
kW-mo/yr
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,171 $2,500 $1,171
10,361
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $934 $2,484 $877
7,759
kWh
$57
-
kW-mo/yr
TOTAL RECOMMENDED $19,872 $83,634 $18,569
164,333
kWh
$1,303
-
kW-mo/yr
TOTAL IMPLEMENTED $11,594 $28,834 $10,354
91,633
kWh
$1,240
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs