ITAC Assessment: MA0808
ITAC logo
ITAC Assessment: MA0808
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Electro Mechanical Assemblies, Machining
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 240,000
ft2
Annual Production 20
ton
Production Hrs. Annual 6,812
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $480,731 3,530,560
kWh
Electricity Demand $145,222 9,960
kW-mo/yr
Electricity Fees $25,318 -
Natural Gas $86,770 8,642
MMBtu
TOTAL YEARLY COSTS $738,041
RECOMMENDED SAVINGS* $127,726 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,534

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.9113: Use solar heat for heat $97,263 $474,397 $85,778
630,720
kWh
- $11,485 -
02 2.2437: Recover waste heat from equipment $13,454 $12,318 - - - $13,454
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,081 $39,024 $4,377
32,182
kWh
$6,999
-
kW-mo/yr
- $(-1,295.0)
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,080 $2,000 $4,080
30,000
kWh
- - -
05 2.8121: Apply for tax-free status for energy purchases $2,848 $500 - - $2,848 -
TOTAL RECOMMENDED $127,726 $528,239 $94,235
692,902
kWh
$6,999
-
kW-mo/yr
$14,333 $12,159
-
MMBtu
TOTAL IMPLEMENTED $17,534 $14,318 $4,080
30,000
kWh
- - $13,454
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs