ITAC Assessment: MA0806
ITAC logo
ITAC Assessment: MA0806
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Engineered Foam and Plastic Components
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $50
M
to 100
M
# of Employees 215
Plant Area 182,000
ft2
Annual Production 8,500,000
units
Production Hrs. Annual 6,656
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $385,512 2,867,245
kWh
Electricity Demand $47,365 8,223
kW-mo/yr
Electricity Fees $78,067 -
Natural Gas $60,201 5,325
MMBtu
TOTAL YEARLY COSTS $571,145
RECOMMENDED SAVINGS* $171,328 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $156,832

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.9113: Use solar heat for heat $131,256 $566,995 $111,012
828,448
kWh
$8,116
-
kW-mo/yr
$12,128 - -
02 2.8121: Apply for tax-free status for energy purchases $22,287 $750 - - - - $22,287
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,496 $71,032 $17,660
131,789
kWh
$3,110
-
kW-mo/yr
- $(-6,274.0)
-
MMBtu
-
04 2.2614: Use cooling tower or economizer to replace chiller cooling $3,289 $15,750 $3,289
24,542
kWh
- - - -
TOTAL RECOMMENDED $171,328 $654,527 $131,961
984,779
kWh
$11,226
-
kW-mo/yr
$12,128 $(-6,274.0)
-
MMBtu
$22,287
TOTAL IMPLEMENTED $156,832 $583,495 $114,301
852,990
kWh
$8,116
-
kW-mo/yr
$12,128 - $22,287
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs