Assessment Year | 2019 |
---|---|
Principal Product | Plastic products for mediacl devices |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 780 |
Plant Area |
190,000
ft2
|
Annual Production | 120,000
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $2,265,262 | 16,920,400 |
kWh
|
$0.13 | |
Electricity Demand | $167,114 | 31,892 |
kW-mo/yr
|
$5.24 | |
Electricity Fees | $(-6,213.0) | - |
|
- | |
Natural Gas | $128,418 | 10,564 |
MMBtu
|
$12.16 | |
Waste Disposal Costs | |||||
Water Usage | $60,031 | 8,972,435 |
Tgal
|
$0.007 | |
Water Disposal | $45,023 | 8,972 |
Tgal
|
$5.02 | |
TOTAL YEARLY COSTS | $2,659,635 | ||||
RECOMMENDED SAVINGS* | $366,656 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $112,694 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $96,513 | $144,000 |
$96,513
720,244
kWh
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $82,405 | $128,486 |
$77,380
577,463
kWh
|
$5,025
-
kW-mo/yr
|
- | - | |
03 | 2.9113: Use solar heat for heat | $77,280 | $383,955 |
$62,315
465,041
kWh
|
- | - | $14,965 | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $40,486 | $165,914 |
$40,486
302,135
kWh
|
- | - | - | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $28,514 | $32,800 |
$28,514
212,792
kWh
|
- | - | - | |
06 | 3.4116: Meter recycled water (to reduce sewer charges) | $25,552 | $7,916 | - | - |
$25,552
-
Tgal
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,131 | $5,222 |
$14,131
105,458
kWh
|
- | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,775 | $200 |
$1,775
13,247
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $366,656 | $868,493 |
$321,114
2,396,380
kWh
|
$5,025
-
kW-mo/yr
|
$25,552
-
Tgal
|
$14,965 | ||
TOTAL IMPLEMENTED | $112,694 | $161,486 |
$107,669
803,502
kWh
|
$5,025
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs