| Assessment Year | 2019 |
|---|---|
| Principal Product | Surgical and medical instruments |
| NAICS | 339112: Surgical and Medical Instrument Manufacturing |
| SIC | 3841: Surgical and Medical Instruments and Apparatus |
| Sales Range | $100 M to 500M |
| # of Employees | 500 |
| Plant Area |
642,000
ft2
|
| Annual Production | 10,000
units
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $497,889 | 3,772,949 |
kWh
|
$0.13 |
| Electricity Demand | $205,885 | 28,887 |
kW-mo/yr
|
$7.13 |
| Electricity Fees | $35,944 | - |
|
- |
| Natural Gas | $311,713 | 49,826 |
MMBtu
|
$6.26 |
| TOTAL YEARLY COSTS | $1,051,431 | |||
| RECOMMENDED SAVINGS* | $355,875 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $103,256 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $227,379 | $500 |
$(-26,277.0)
(-877,500)
kWh
|
$253,656
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $100,108 | $144,760 |
$87,778
664,987
kWh
|
$12,330
-
kW-mo/yr
|
- | - | |
| 03 | 2.8121: Apply for tax-free status for energy purchases | $25,240 | $1,000 | - | - | $25,240 | - | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,014 | $300 |
$2,014
15,258
kWh
|
- | - | - | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,134 | $1,000 | - | - | - |
$1,134
-
MMBtu
|
|
| TOTAL RECOMMENDED | $355,875 | $147,560 |
$63,515
(-197,255)
kWh
|
$265,986
-
kW-mo/yr
|
$25,240 |
$1,134
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $103,256 | $146,060 |
$89,792
680,245
kWh
|
$12,330
-
kW-mo/yr
|
- |
$1,134
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs