ITAC Assessment: MA0802
ITAC logo
ITAC Assessment: MA0802
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Commercial printing
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 70,000
ft2
Annual Production 500
ton
Production Hrs. Annual 8,616
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $940,556 7,417,564
kWh
Electricity Demand $91,493 15,245
kW-mo/yr
Electricity Fees $5,862 -
Natural Gas $213,801 21,945
MMBtu
TOTAL YEARLY COSTS $1,251,712
RECOMMENDED SAVINGS* $161,508 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,263

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $109,879 $475,000 - - $109,879
-
MMBtu
02 2.6218: Turn off equipment when not in use $29,299 $2,830 $18,898
148,803
kWh
- $10,401
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,618 $47,380 $18,296
144,060
kWh
$1,206
-
kW-mo/yr
$(-4,884.0)
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,964 $22,750 $4,964
39,086
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,748 $13,000 $2,748
21,641
kWh
- -
TOTAL RECOMMENDED $161,508 $560,960 $44,906
353,590
kWh
$1,206
-
kW-mo/yr
$115,396
-
MMBtu
TOTAL IMPLEMENTED $34,263 $25,580 $23,862
187,889
kWh
- $10,401
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs