Assessment Year | 2019 |
---|---|
Principal Product | Commercial printing |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
70,000
ft2
|
Annual Production | 500
ton
|
Production Hrs. Annual | 8,616
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $940,556 | 7,417,564 |
kWh
|
$0.13 |
Electricity Demand | $91,493 | 15,245 |
kW-mo/yr
|
$6.00 |
Electricity Fees | $5,862 | - |
|
- |
Natural Gas | $213,801 | 21,945 |
MMBtu
|
$9.74 |
TOTAL YEARLY COSTS | $1,251,712 | |||
RECOMMENDED SAVINGS* | $161,508 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,263 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $109,879 | $475,000 | - | - |
$109,879
-
MMBtu
|
|
02 | 2.6218: Turn off equipment when not in use | $29,299 | $2,830 |
$18,898
148,803
kWh
|
- |
$10,401
-
MMBtu
|
|
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $14,618 | $47,380 |
$18,296
144,060
kWh
|
$1,206
-
kW-mo/yr
|
$(-4,884.0)
-
MMBtu
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,964 | $22,750 |
$4,964
39,086
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,748 | $13,000 |
$2,748
21,641
kWh
|
- | - | |
TOTAL RECOMMENDED | $161,508 | $560,960 |
$44,906
353,590
kWh
|
$1,206
-
kW-mo/yr
|
$115,396
-
MMBtu
|
||
TOTAL IMPLEMENTED | $34,263 | $25,580 |
$23,862
187,889
kWh
|
- |
$10,401
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs