Assessment Year | 2019 |
---|---|
Principal Product | Chisels and ppunches |
NAICS | 332216: Saw Blade and Handtool Manufacturing |
SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
77,000
ft2
|
Annual Production | 2,500,000
units
|
Production Hrs. Annual | 8,496
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $237,575 | 1,860,768 |
kWh
|
$0.13 |
Electricity Demand | $68,424 | 4,063 |
kW-mo/yr
|
$16.84 |
Electricity Fees | $3,701 | - |
|
- |
Natural Gas | $74,509 | 8,507 |
MMBtu
|
$8.76 |
TOTAL YEARLY COSTS | $384,209 | |||
RECOMMENDED SAVINGS* | $23,603 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,739 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $12,419 | $18,225 |
$12,419
97,025
kWh
|
- | |
02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $4,247 | $16,050 |
$4,247
33,444
kWh
|
- | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $3,353 | $500 |
$136
1,072
kWh
|
$3,217
-
MMBtu
|
|
04 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $2,739 | $3,000 |
$2,739
21,396
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $845 | $500 |
$845
6,603
kWh
|
- | |
TOTAL RECOMMENDED | $23,603 | $38,275 |
$20,386
159,540
kWh
|
$3,217
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,739 | $3,000 |
$2,739
21,396
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs