ITAC Assessment: MA0792
ITAC logo
ITAC Assessment: MA0792
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Specialty paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 70
Plant Area 100,000
ft2
Annual Production 2,100
ton
Production Hrs. Annual 8,592
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $582,730 4,701,000
kWh
Natural Gas $135,895 24,051
MMBtu
Other Energy $224,654 8,767
MMBtu
TOTAL YEARLY COSTS $943,279
RECOMMENDED SAVINGS* $182,916 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,561

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings
01 2.1392: Replace purchased steam with other energy source $158,611 $1,000,000 - $(-66,043.0)
-
MMBtu
$224,654
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,850 $16,551 $12,850
103,626
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,711 $9,925 $7,711
62,188
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,744 $3,340 $3,744
30,193
kWh
- -
TOTAL RECOMMENDED $182,916 $1,029,816 $24,305
196,007
kWh
$(-66,043.0)
-
MMBtu
$224,654
-
MMBtu
TOTAL IMPLEMENTED $20,561 $26,476 $20,561
165,814
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs