ITAC Assessment: MA0790
ITAC logo
ITAC Assessment: MA0790
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Water treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 51
Plant Area 100,000
ft2
Annual Production 8,370,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,266,846 13,728,918
kWh
Electricity Demand $435,058 24,791
kW-mo/yr
Electricity Fees $26,400 -
Natural Gas $78,730 9,943
MMBtu
TOTAL YEARLY COSTS $1,807,034
RECOMMENDED SAVINGS* $329,708 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $116,387

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $207,219 $1,000,000 - $207,219
-
kW-mo/yr
-
02 3.1191: Change procedures / equipment / operating conditions $48,698 $124,000 $48,698
529,331
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $24,345 $33,774 $12,254
133,197
kWh
$12,091
-
kW-mo/yr
-
04 3.1191: Change procedures / equipment / operating conditions $19,380 $500 $19,380
210,652
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,372 $5,831 $8,058
87,588
kWh
- $7,314
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,658 $25,350 $6,658
72,366
kWh
- -
07 2.6218: Turn off equipment when not in use $4,286 $100 $3,286
35,716
kWh
$1,000
-
kW-mo/yr
-
08 2.4322: Use or replace with energy efficient substitutes $1,934 $6,774 $1,934
21,024
kWh
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,816 $4,785 $1,816
19,736
kWh
- -
TOTAL RECOMMENDED $329,708 $1,201,114 $102,084
1,109,610
kWh
$220,310
-
kW-mo/yr
$7,314
-
MMBtu
TOTAL IMPLEMENTED $116,387 $196,229 $96,982
1,054,158
kWh
$12,091
-
kW-mo/yr
$7,314
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs