ITAC Assessment: MA0784
ITAC logo
ITAC Assessment: MA0784
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Waste water treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area 100,000
ft2
Annual Production 6,205,000
units
Production Hrs. Annual 8,760
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,034,023 11,995,247
kWh
Electricity Demand $316,099 24,352
kW-mo/yr
Electricity Fees $7,690 -
TOTAL YEARLY COSTS $1,357,812
RECOMMENDED SAVINGS* $164,904 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,936

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4131: Size electric motors for peak operating efficiency $64,908 $71,450 $64,908
754,740
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,884 $24,000 $35,884
417,259
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,360 $16,650 $26,360
306,514
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,530 $41,013 $12,025
139,823
kWh
$2,505
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,498 $18,391 $5,097
59,271
kWh
$1,401
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,233 $16,685 $14,233
165,495
kWh
-
07 3.1191: Change procedures / equipment / operating conditions $2,491 $500 $2,491
28,963
kWh
-
TOTAL RECOMMENDED $164,904 $188,689 $160,998
1,872,065
kWh
$3,906
-
kW-mo/yr
TOTAL IMPLEMENTED $85,936 $130,854 $82,030
953,834
kWh
$3,906
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs