Assessment Year | 2017 |
---|---|
Principal Product | Pre-straining and testing of aircraft forgings |
NAICS | 334519: Other Measuring and Controlling Device Manufacturing |
SIC | 3829: Measuring and Controlling Devices, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 26 |
Plant Area |
40,000
ft2
|
Annual Production | 4,000
units
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $65,135 | 1,653,400 |
kWh
|
$0.039 |
Electricity Demand | $177,855 | 14,336 |
kW-mo/yr
|
$12.41 |
Electricity Fees | $(-14,391.0) | - |
|
- |
Natural Gas | $970 | 87 |
MMBtu
|
$11.15 |
TOTAL YEARLY COSTS | $229,569 | |||
RECOMMENDED SAVINGS* | $26,827 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,221 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.9113: Use solar heat for heat | $17,909 | $431,094 |
$17,909
459,203
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,697 | $19,975 |
$2,697
69,149
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,297 | $14,420 |
$2,766
70,916
kWh
|
$2,531
-
kW-mo/yr
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $924 | $2,760 |
$477
12,240
kWh
|
$447
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $26,827 | $468,249 |
$23,849
611,508
kWh
|
$2,978
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $6,221 | $17,180 |
$3,243
83,156
kWh
|
$2,978
-
kW-mo/yr
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs