ITAC Assessment: MA0783
ITAC logo
ITAC Assessment: MA0783
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Pre-straining and testing of aircraft forgings
NAICS 334519: Other Measuring and Controlling Device Manufacturing
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 26
Plant Area 40,000
ft2
Annual Production 4,000
units
Production Hrs. Annual 4,250
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,135 1,653,400
kWh
Electricity Demand $177,855 14,336
kW-mo/yr
Electricity Fees $(-14,391.0) -
Natural Gas $970 87
MMBtu
TOTAL YEARLY COSTS $229,569
RECOMMENDED SAVINGS* $26,827 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,221

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9113: Use solar heat for heat $17,909 $431,094 $17,909
459,203
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,697 $19,975 $2,697
69,149
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,297 $14,420 $2,766
70,916
kWh
$2,531
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $924 $2,760 $477
12,240
kWh
$447
-
kW-mo/yr
TOTAL RECOMMENDED $26,827 $468,249 $23,849
611,508
kWh
$2,978
-
kW-mo/yr
TOTAL IMPLEMENTED $6,221 $17,180 $3,243
83,156
kWh
$2,978
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs