| Assessment Year | 2017 |
|---|---|
| Principal Product | Aerospace Components |
| NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $10 M to 50M |
| # of Employees | 60 |
| Plant Area |
50,000
ft2
|
| Annual Production | 10,000
units
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $134,961 | 1,385,280 |
kWh
|
$0.097 |
| Electricity Demand | $73,371 | 5,593 |
kW-mo/yr
|
$13.12 |
| Electricity Fees | $5,011 | - |
|
- |
| Natural Gas | $28,061 | 1,524 |
MMBtu
|
$18.41 |
| TOTAL YEARLY COSTS | $241,404 | |||
| RECOMMENDED SAVINGS* | $53,445 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,019 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9113: Use solar heat for heat | $33,144 | $405,711 |
$33,144
341,692
kWh
|
- | - | |
| 02 | 2.3212: Optimize plant power factor | $7,386 | $6,000 | - |
$7,386
-
kW-mo/yr
|
- | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,896 | $61,500 |
$13,139
135,462
kWh
|
$8,186
-
kW-mo/yr
|
$(-10,429.0)
-
MMBtu
|
|
| 04 | 2.7241: Install outside air damper / economizer on hvac unit | $1,734 | $2,724 |
$1,734
17,873
kWh
|
- | - | |
| 05 | 2.2136: Install / repair insulation on steam lines | $285 | $215 |
$285
2,930
kWh
|
- | - | |
| TOTAL RECOMMENDED | $53,445 | $476,150 |
$48,302
497,957
kWh
|
$15,572
-
kW-mo/yr
|
$(-10,429.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,019 | $2,939 |
$2,019
20,803
kWh
|
- | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs