ITAC Assessment: MA0779
ITAC logo
ITAC Assessment: MA0779
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Aircraft engine components
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $5
M
to 10
M
# of Employees 27
Plant Area 18,000
ft2
Annual Production 50
units
Production Hrs. Annual 4,386
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,588 779,146
kWh
Electricity Demand $15,283 1,251
kW-mo/yr
Natural Gas $6,790 674
MMBtu
TOTAL YEARLY COSTS $127,661
RECOMMENDED SAVINGS* $92,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,462

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.9113: Use solar heat for heat $71,879 $609,753 $71,879
528,525
kWh
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,670 $8,325 $7,670
56,394
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,745 $19,917 $6,745
49,599
kWh
04 2.6218: Turn off equipment when not in use $3,249 $100 $3,249
23,892
kWh
05 2.2614: Use cooling tower or economizer to replace chiller cooling $2,890 $7,225 $2,890
21,249
kWh
06 2.4231: Reduce the pressure of compressed air to the minimum required $213 $200 $213
1,569
kWh
TOTAL RECOMMENDED $92,646 $645,520 $92,646
681,228
kWh
TOTAL IMPLEMENTED $3,462 $300 $3,462
25,461
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings