Assessment Year | 2017 |
---|---|
Principal Product | Aircraft engine components |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $5 M to 10M |
# of Employees | 27 |
Plant Area |
18,000
ft2
|
Annual Production | 50
units
|
Production Hrs. Annual | 4,386
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $105,588 | 779,146 |
kWh
|
$0.14 |
Electricity Demand | $15,283 | 1,251 |
kW-mo/yr
|
$12.22 |
Natural Gas | $6,790 | 674 |
MMBtu
|
$10.07 |
TOTAL YEARLY COSTS | $127,661 | |||
RECOMMENDED SAVINGS* | $92,646 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,462 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.9113: Use solar heat for heat | $71,879 | $609,753 |
$71,879
528,525
kWh
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,670 | $8,325 |
$7,670
56,394
kWh
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,745 | $19,917 |
$6,745
49,599
kWh
|
|
04 | 2.6218: Turn off equipment when not in use | $3,249 | $100 |
$3,249
23,892
kWh
|
|
05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,890 | $7,225 |
$2,890
21,249
kWh
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $213 | $200 |
$213
1,569
kWh
|
|
TOTAL RECOMMENDED | $92,646 | $645,520 |
$92,646
681,228
kWh
|
||
TOTAL IMPLEMENTED | $3,462 | $300 |
$3,462
25,461
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs