ITAC Assessment: MA0777
ITAC logo
ITAC Assessment: MA0777
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Resins
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 255
Plant Area 88,000
ft2
Annual Production 6,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $885,304 7,703,850
kWh
Electricity Demand $120,756 20,977
kW-mo/yr
Electricity Fees $5,352 -
Natural Gas $190,424 21,562
MMBtu
Waste Disposal Costs
Water Usage $11,439 1,168,944
Tgal
TOTAL YEARLY COSTS $1,213,275
RECOMMENDED SAVINGS* $66,757 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $39,579 $137,422 $34,499
299,993
kWh
$5,080
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,610 $30,976 $8,378
72,851
kWh
$1,232
-
kW-mo/yr
03 2.3212: Optimize plant power factor $2,136 $5,392 - $2,136
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,805 $3,330 $2,805
24,397
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,627 $11,435 $12,627
109,800
kWh
-
TOTAL RECOMMENDED $66,757 $188,555 $58,309
507,041
kWh
$8,448
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs